CHALLENGE: To provide access scaffold for extensive renovation work on a bridge carrying an arterial road route 80 feet above a canal cutting.
SOLUTION. A large scale scaffolding scheme to provide clear access for a range of remedial works.
The scheme involved repairs to the bridge deck and structure, waterproofing, new road surfacing and white lines, and upgrading bridge parapets.
Hugely experienced in the field of both bridge replacements and refurbishments, on the Scott bridge project R&C Williams showcased a broad range of capabilities including:
– Concrete repairs to bridge deck and substructure
– Re-waterproof the bridge deck
– Install new expansion joints
– Upgrade the existing bridge parapets
– Install cathodic protection to the concrete structure
– Resurface the carriageway and footpath
JFE Attridge deliver a comprehensive range of solutions for rail, road and waterway projects ...
Read moreSpecialists in providing scaffolding schemes that deliver the safest and optimum access solutions ...
Read moreCHALLENGE: Sometimes engineering challenges only tell part of the story. In addition to structural tests …
CHALLENGE: Restoration of the historic Grade II* Barmouth Viaduct. The viaduct is the longest timber …
CHALLENGE: To provide access scaffold for extensive renovation work on a bridge carrying an arterial …